Projects

JGC Gulf offers a high degree of flexibility on a wide range of services to suit client's requirements. These services are both effective and cost efficient. We always give the best services to our Clients and ensure long-term working relationships.

Project Image
Map

EFPS in Refinery & Sitra Tanks Project

Project Profile:
Perform Engineering, Procurement, Construction, Pre-Commissioning, training, Commissioning, testing, of replacing existing fire water network and upgrade it to NFPA standards. The Project includes the construction of 2 new pumphouses and install new fire water network in the refinery and Sitra Tank farm area.
Client Satisfaction
Client: BAPCO
Project Location: Bahrain
Start & Completion Date: Feb 2017 - 30 Dec 2019
JGC Scope: EPC
Middle East Growth

CDU Heaters Replacement Project

Project Profile:
Replacement of existing three parallel fired heaters (7F601A, 7F601B and 7F603) of the 5CDU unit with a single high efficiency new Crude charge heater to improve thermal efficiency, reliability, operability and environmental performance as well as to reduce maintenance cost. New heater shall be vertical cylindrical heater with radiant, convection and stack sections. Heat duty (design)- 148.66 MMBtu/Hr. Three existing booster pumps (P608/P649/P603) to be replaced with two new pumps P701/P702. Stack to 7F601 A & B Guy Wire Relocation. All associated piping works including Tie-in to existing facilities in Pump trench Area and Heater Trench Area.
Client Satisfaction
Client: BAPCO
Project Location: Bahrain
Start & Completion Date: 26 July 2017 - 25 July 2019
JGC Scope: EPC
Middle East Growth

Replace Utility Packaged Boilers at BGP Project

Project Profile:
Demolition of 2 x LP Boilers (476-F-1A/B), 2 x HP Boilers (476-F-2A/B) and Installation of 2 x New HP Boilers (476-F-1001 & 1002) and other associated works.
Client Satisfaction
Client: Saudi Aramco
Project Location: Berri, Jubail, Saudi Arabia
Start & Completion Date: Feb. 2017 - May. 2020
JGC Scope: EPC - LSTK
Middle East Growth

Sitra Tanks & Field Pipeline Project

Project Profile:
Brownfield, Engineering, Procurement, Construction and provision of Commissioning Start-up Assistance: 1. Sitra Storage Area, 2. CGP III Battery Limits, 3. Upstream of CGP III, 4. Refinery Off Gas (ROG), 5. Associated Gas Gathering System, 6. CGP I/II, 7. Downstream of CGP III, 8. Residue Gas to MGIH, 9. Export to Sitra Storage Area. Project also include installation of 6” Butane Line from CGP III to Sitra Storage Area.
Client Satisfaction
Client: BANAGAS
Project Location: Southern Awali, Bahrain
Start & Completion Date: August 2016 - Nov 2018
JGC Scope: EPC
Middle East Growth

Northern Arabia Unconventional Gas System 'A' Project

Project Profile:
Involves the installation of 10 Well Heads Manifold, 10 Flowlines (6” with 2.5KM each) and One 50MM SCFD Processing Facilities consisting of HP/LP Inlet Separators, Compressor, TEG Unit, Gas Turbine Generator, PIB, Chemical Tanks, Evaporation Pond and Control Room for both System A & System B.
Client Satisfaction
Client: Saudi Aramco
Project Location: Al Turaif, Saudi Arabia
Start & Completion Date: July 2015 - Aug 2018
JGC Scope: EPC
Middle East Growth

Rehabilitation of Crude oil Terminal Project

Project Profile:
EPCm project for rehabilitating Al Muajjiz terminal facilities, scope includes assessment of existing facility which were mothballed for 20 years, and client objectives was to salvage and reuse the existing material integrated with new additional scope requirements per Aramco standards.
Client Satisfaction
Client: Saudi Aramco
Project Location: Yanbu, Saudi Arabia
Start & Completion Date: Mar 2013 - Apr 2019
JGC Scope: EPCm
Middle East Growth

Rabigh II - Ethane Cracker DBN Project Package

Project Profile:
Installation of three new Cracking furnaces, de-blanking of the quench water tower, modification of major compressors and turbines, installation of two new additional cooling towers, replacement of column trays, installation of additional extra catalyst to acetylene reactors, modification of heat exchanger conditions, modification of safety relief valves, modification of control valves, flow instruments and their accessories, and related tie-ins to other units.
Client Satisfaction
Client: Saudi Aramco
Project Location: Rabigh, Saudi Arabia
Start & Completion Date: Oct. 2012 - Sept. 2016
JGC Scope: EPC
Client Satisfaction

SADARA Aromatics Project

Project Profile:
The Aromatics Unit consists of a pygas and purchased benzene and toluene Hydrogenation Unit, an Extraction Unit and Envelope Shared Services unit.
Middle East Growth
Client: Sadara Chemical Company
Project Location: Jubail, Saudi Arabia
Start & Completion Date: Aug. 2012 - Dec. 2014
JGC Scope: EPC - LSTK
Client Satisfaction

Gas Compressor

Project Profile:
The design of the new gas compressor, gas turbine driver, pipelines and associated gas gathering lines, power supply and the station's process equipment and utilities.
Middle East Growth
Client: BANAGAS
Project Location: Kingdom of Bahrain
Start & Completion Date: Sep. 2011 - Aug. 2013
JGC Scope: EPC
Client Satisfaction

Water Treatment Facility

Project Profile:
The Water Treatment Facility - Phase 3 was designed to treat maximum of 170,000 BPD of Khafji produced water to accommodate the increase of water cut (up to 50%) of Khafji Crude production, in order to achieved and maintain maximum sustainable capacity of 300,000 BPD of Khafji Crude and 50,000 BDP of Hout Crude. The on-shore pipeline and disposal water Injection Facility is designed to inject 170,000 BPD of treated Khafji produced water into five new onshore disposal wells.
Middle East Growth
Client: Al Khafji Joint Operations (KJO)
Project Location: Al Khafji, Saudi Arabia
Start & Completion Date: Sep. 2010 - May 2015
JGC Scope: EPC - LSTK
Client Satisfaction

Upgrade of Refinery

Project Profile:
Upgrade of refinery with additional new units to meet environmental standards. It involved the upgrade of super Claus units, construction of a new off-gas treating unit, a Sour Water Stripper and other support utilities.
Middle East Growth
Client: Saudi Aramco Shell Refinery (SASREF)
Project Location: Jubail, Saudi Arabia
Start & Completion Date: Jan. 2010 - June 2012
JGC Scope: EPC
Client Satisfaction

Tanajib Water Treatment Plant

Project Profile:
Tanajib Water Treatment Plant is a facility that treats sea water using multi effect distillation (MED) and reverse osmosis (RO). It provides BFW and potable water to Aramco. The facility is located in the Northwest coast of Arabian Gulf in Saudi Arabia, approx. 60Km from the MCPF.
Middle East Growth
Client: Saudi Aramco / JGC Holdings Corporation
Project Location: Tanajib, Saudi Arabia
Start & Completion Date: March 2009 - Dec. 2013
JGC Scope: EPC
Client Satisfaction