Water Treatment Facility

Project Profile: The Water Treatment Facility – Phase 3 was designed to treat maximum of 170,000 BPD of Khafji produced water to accommodate the increase of water cut (up to 50%) of Khafji Crude production, in order to achieved and maintain maximum sustainable capacity of 300,000 BPD of Khafji Crude and 50,000 BDP of Hout Crude. The on-shore pipeline and disposal water Injection Facility is designed to inject 170,000 BPD of treated Khafji produced water into five new onshore disposal wells.

 

Water Treatment Facility