PROJECTS

JGC Gulf offers a high degree of flexibility on a wide range of services to suit client’s requirements. These services are both effective and cost efficient. We always give the best services to our Clients and ensure long-term working relationships.

Project Location

EFPS in Refinery & Sitra Tanks Project

Project Profile:  Perform Engineering, Procurement, Construction, Pre-Commissioning, training, Commissioning, testing, of replacing existing fire water network and upgrade it to NFPA standards. The Project includes the construction of 2 new pumphouses and install new fire water network in the refinery and Sitra Tank farm area.

Client: BAPCO

Project Location: Bahrain

Start & Completion Date: Feb 2017 – 30 Dec 2019

JGC Scope: EPC

EFPS in Refinery & Sitra Tanks Project
EFPS in Refinery & Sitra Tanks Project

CDU Heaters Replacement Project

Project Profile:  Replacement of existing three parallel fired heaters (7F601A, 7F601B and 7F603) of the 5CDU unit with a single high efficiency new Crude charge heater to improve thermal efficiency, reliability, operability and environmental performance a s well as to reduce maintenance cost. New heater shall be vertical cylindrical heater with radiant, convection and stack sections. Heat duty (design)- 148.66 MMBtu/Hr. Three existing booster pumps (P608/P649/P603) to be replaced with two new pumps P701/P702.Stack to 7F601 A & B Guy Wire Relocation. All associated piping works including Tie-in to existing facilities in Pump trench Area and Heater Trench Area.  

Client: BAPCO

Project Location: Bahrain

Start & Completion Date: 26 July 2017 – 25 July 2019

JGC Scope: EPC

CDU Heaters Replacement Project
CDU Heaters Replacement Project

Replace Utility Packaged Boilers at BGP Project

Project Profile:  Demolition of 2 x LP Boilers (476-F-1A/B), 2 x HP Boilers (476-F-2A/B) and Installation of 2 x New HP Boilers (476-F-1001 & 1002) and other associated works.  

Client: Saudi Aramco

Project Location: Berri, Jubail, Saudi Arabia

Start & Completion Date: Feb. 2017 – May. 2020

JGC Scope: EPC – LSTK

Replace Utility Packaged Boilers at BGP Project
Replace Utility Packaged Boilers at BGP Project

Sitra Tanks & Field Pipeline Project

Project Profile:  Brownfield, Engineering, Procurement, Construction and provision of Commissioning Start-up Assistance: 1. Sitra Storage Area, 2. CGP III Battery Limits, 3. Upstream of CGP III, 4. Refinery Off Gas (ROG), 5. Associated Gas Gathering System, 6. CGP I/II, 7. Downstream of CGP III, 8. Residue Gas to MGIH, 9. Export to Sitra Storage Area.Project also include installation of 6” Butane Line from CGP III to Sitra Storage Area.  

Client: BANAGAS

Project Location: Southern Awali, Bahrain

Start & Completion Date: August 2016  – Nov 2018

JGC Scope: EPC

Sitra Tanks & Field Pipeline Project
Sitra Tanks & Field Pipeline Project

Northern Arabia Unconventional Gas System ‘A’ Project

Project Profile:  involves the installation of 10 Well Heads Manifold, 10 Flowlines (6” with 2.5KM each) and One 50MM SCFD (Standard Cubic Feet per Day) Processing Facilities consisting of HP/LP Inlet Separators, Compressor, TEG Unit, Gas Turbine Generator, PIB, Chemical Tanks, Evaporation Pond and Control Room for both System A & System B.

Client: Saudi Aramco

Project Location: Al Turaif, Saudi Arabia

Start & Completion Date: July 2015 – Aug 2018

JGC Scope: EPC

Northern Arabia Unconventional Gas System ‘A’ Project
Northern Arabia Unconventional Gas System ‘A’ Project

Rehabilitation of Crude oil Terminal Project.

Project Profile:  EPCm project for rehabilitating Al Muajjiz terminal facilities, scope includes assessment of existing facility which were mothballed for 20 years, and client objectives was to salvage and reuse the existing material integrated with new additional scope requirements per Aramco standards.  

Client: Saudi Aramco

Project Location: Yanbu, Saudi Arabia

Start & Completion Date: Mar 2013 – Apr 2019

JGC Scope: EPCm

Rehabilitation of Crude oil Terminal Project.
Rehabilitation of Crude oil Terminal Project.

Rabigh II – Ethane Cracker DBN Project Package

Project Profile:  Installation of three new Cracking furnaces, de-blanking of the quench water tower, modification of major compressors and turbines, installation of two new additional cooling towers, replacement of column trays, installation of additional extra catalyst to acetylene reactors, modification of heat exchanger conditions, modification of safety relief valves, modification  of control valves, flow instruments and their accessories, and related tie-ins to other units.  

Client: Saudi Aramco

Project Location: Rabigh, Saudi Arabia

Start & Completion Date: Oct. 2012 – Sept. 2016

JGC Scope: EPC

Rabigh II – Ethane Cracker DBN Project Package
Rabigh II – Ethane Cracker DBN Project Package

SADARA Aromatics Project

Project Profile:  The Aromatics Unit consists of a pygas and purchased benzene and toluene Hydrogenation Unit, an Extraction Unit and Envelope Shared Services unit.  

Client: Sadara Chemical Company

Project Location: Jubail, Saudi Arabia

Start & Completion Date: Aug. 2012 – Dec. 2014

JGC Scope: EPC – LSTK

SADARA Aromatics Project
SADARA Aromatics Project

Gas Compressor

Project Profile:  The design of the new gas compressor, gas turbine driver, pipelines and associated gas gathering lines, power supply and the station’s process equipment and utilities.    

Client: BANAGAS

Project Location: Kingdom of Bahrain

Start & Completion Date: Sep. 2011 – Aug. 2013

JGC Scope: EPC

Gas Compressor
Gas Compressor

Water Treatment Facility

Project Profile: The Water Treatment Facility – Phase 3 was designed to treat maximum of 170,000 BPD of Khafji produced water to accommodate the increase of water cut (up to 50%) of Khafji Crude production, in order to achieved and maintain maximum sustainable capacity of 300,000 BPD of Khafji Crude and 50,000 BDP of Hout Crude. The on-shore pipeline and disposal water Injection Facility is designed to inject 170,000 BPD of treated Khafji produced water into five new onshore disposal wells.  

Client: Al Khafji Joint Operations (KJO)

Project Location: Al Khafji, Saudi Arabia

Start & Completion Date: Sep. 2010 – May 2015

JGC Scope: EPC – LSTK

Water Treatment Facility
Water Treatment Facility

Upgrade of Refinery

Project Profile:  Upgrade of refinery with additional new units to meet environmental standards. It  involved the upgrade of super Claus units, construction of a new off-gas treating unit, a Sour Water Stripper and other support utilities.  

Client: Saudi Aramco Shell Refinery (SASREF)

Project Location: Jubail, Saudi Arabia

Start & Completion Date: Jan. 2010 – June 2012

JGC Scope: EPC

Upgrade of Refinery
Upgrade of Refinery

Tanajib Water Treatment Plant

Project Profile:  Tanajib Water Treatment Plant is a facility that treats sea water using multi effect distillation (MED) and reverse osmosis (RO). It provides BFW and potable water to Aramco.  The  facility is located in the Northwest coast of Arabian Gulf in Saudi Arabia, approx. 60Km from the MCPF.  

Client: Saudi Aramco / JGC Holdings Corporation

Project Location: Tanajib, Saudi Arabia

Start & Completion Date: March 2009 – Dec. 2013

JGC Scope: EPC

Tanajib Water Treatment Plant
Tanajib Water Treatment Plant