Sour Water Stripper

Sour Water Stripper

Water Treatment Facilities
KJO Water Treatment Facilities Project Phase 3 was designed to treat maximum of 170,000 BPD of Khafji produced water to accommodate the increase of water cut (up to 50{575888aee3618986d494245ce062c40741765afc8e11f67b0ecc43a23fcf6918}) of Khafji Crude production. In order to achieve and maintain maximum sustainable capacity of 300,000 BPD of Khafji Crude and 50,000 BDP of Hout Crude.
The on-shore pipeline and disposal water Injection Facility is designed to inject 170,000 BPD of treated Khafji produced water into five new onshore disposal wells.
Client Name: Al Khafji Joint Operations (KJO)
Project Completion: 2015 / May.